Our completed Projects
Home
Projects
Year | Name of Project | Client |
2016 | Geo-Technical Investigation work for Dedicated Freight Corridor Project | L&T Construction Infrastructure |
2014 | Geo-Technical Investigation for River Crossing in Gujarat for Dahej | Reliance Gas Pipeline Limited |
2015 | Detailed Design Consultancy Services for Viaduct Corridor ? North-South- | STUP Consultant Pvt Ltd |
2013 | Geo-Technical Investigation work for Dedicated Freight Corridor Project | L&T Construction Infrastructure |
2015 | Geo-Technical Investigation work including Laboratory Testing | Adani Power Rajasthan Limited |
2012 | Offshore Investigation Work for RO RO Ferry Terminal | Essar Projects (India) Limited |
2014 | Geo-Technical Investigation for Hazira Railway Line | Hazira Infrastructure Private Limited |
2016 | Soil Investigation work for proposed Project | Gujarat Maritme Board |
2016 | Offshore (Marine) drilling work in water | R&B |
2012 | Topographical and Geo-Technical & Hydrological Survey for HDD | Gail India Limited |
2016 | Carryout the pump-out test work in the Chir River | WAPCOS Limited |
2016 | Consultancy services for Structural Stability | Nirma Ltd. |
2015 | Geotechnical Investigation, Topographical Survey and Hydrological Study Work | Solaire Power Pvt. Ltd. |
2015 | NDT testing of Fire Water Pump House Structural adequacy | Megha Engineering & Infrastructure Limited |
2015 | Consultancy services for Structural Stability at Bawal | TII INDIA Pvt. Ltd. |
2014 | Consultancy Services for Developing Infrastructure facilities at Arvind | Arvind Infrastructure Pvt. Ltd., Ahmedabad |
2014 | Consultancy Services for Detailed Design/Study of Drainage Network | Shree Digvijay Cement Co. Ltd. |
2013 | Consultancy Services for NDT Test Work at Ingersoll Rand, Naroda (GIDC), Ahmedab | C. R. Narayana Rao LLP |
2013 | Structure Stability Assessment of factor Building | C. R. Narayana Rao LLP |
2010 | Third Party Inspection for Upgradation of Industrial Infrastructure of GIDC Esta | Mehsana Industries Owners Association, Mehsana |
2009 | Consultancy Services for Detail Technical engineering Study for Construction of | GMB |
2008 | Quality Assurance and Quality Control & Supervision/Inspection work | Kerala Industries Association |
2008 | Third Party QA/QC work for the Strengthening of Columns, abutments and slabs | Som Datt Builders-NCC (JV) |
2007 | Geotechnical Investigation & Pavement Design For Proposed Construction of Road | Ambuja Cement |
2007 | Consultancy Services for Evaluation of RCC Bridge at Porbandar, Gujarat | GMB |
2007 | Consultancy services for Evaluation of Existing Dry Cargo Berth With Approach at | GMB |
2005 | Third Party Inspection work for Development work of basic Infrastructure Facilit | GIDC Ahmedabad |
2005 | Consultancy Services for Strengthening/ Widening of Pavement of SH-7 for 43km | Frischmann Prabhu(India) Pvt. Ltd |
2004 | Consultancy Services for NDT Testing for Railway Over Bridge at Karjan | R & B Vadodara |
2003 | Consultancy Services for Geotechnical & Hydrological Investigation | Western Railway , IR , Baroda |
2016 | Geotechnical Investigation &Survey Work for Western Dedicated freight corridor | L&T Construction Infrastructure IC |
2011 | Detailed Geotechnical Investigation works including Laboratory Testing for 1320M | ADANI PENCH POWER LTD. |
2016 | Soil Investigation for work at various places in Ahmedabad city & Ahmedabad & Su | GUJARAT STATE POLICE HOUSING CORPORATION LIMITED, |
2014 | Geotechnical Investigation for Hazira Railway Line (Ch.30.80 km to Hazira Port E | HAZIRA INFRASTRUCTURE PVT. LTD., SURAT |
2005 | Geotechnical Investigation for the study of the stability of walls, bastions and | Archaeological Survey of India Jaipur- GOI |
2015 | Consultancy Services for soil Investigation for PROVN of OTM ACCN For 12 FD Sub | MES Garrison Engineer Army Jaisalmer |
2017 | Soil Investigation Work at 765/400/220kV Banaskantha Substation | Power Grid Corporation of India Limited |
2017 | Soil Investigation work for Explanatory Boring at Mandsaur, Madhya Pradesh | Dineshchandra R Agrawal Infracon Pvt Ltd |
2015 | Geotechnical Investigation & Survey Work for Western Dedicated freight corridor (WDFC) CTP-3(R) (Phase- IV & V) | Larsen & Toubro Ltd |
2015 | Detailed Design Consultancy Services for Viaduct Corridor – North – South (from Interface Point with Gyaspur Depot, that is, Abutment to Depot to APMC to Motera Stadium ) all elevated Via-duct portion from Chainage (-) 1615.00 to (+) 17017.00m and elevated metro stations (Ten Numbers) Viz | Stup Consultants Pvt. Ltd. |
2017 | Consultancy Services for Topographical survey and soil Investigation work for development of GREENFIELD AIRPORT AT HIRASHAR, RAJKOT (GUJARAT) | Engineers India Limited, |
2016 | Soil Investigation for work at various places in Ahmedabad city & Ahmedabad &Surendranagar Districts of Gujarat State. | Gujarat State Police Housing Corporation Limited, Ahmedabad |
2016 | Soil Investigation work for New District Jail and Proposed Construction Building of Faridaka, Near Vartej, Distt:- Bhavnagar | Gujarat State Police Housing Corporation Limited, Junagadh |
2010 | Detailed Geotechnical Investigation works including Laboratory Testing for 1320Mw Pench Thermal Power Project, Chhindwara,MP | Adani Pench Power Ltd |
2013 | Geotechnical Investigation for Dedicated freight corridor Project (WDFC) CTP 1 & 2 | L &TCONSTRUCTION |
2013 | Carrying out Geotechnical Investigation for Western DFCC Project, Package-3, Vadodara | Larsen & Tourbo Ltd |
2017 | Soil Investigation for work at various places in Junagadh, Amreli, Porbandar 7 Bhavnagar Districts of Gujarat (2 yrs. of annual Contract) | Gujarat State Police Housing Corporation Limited, Gandhinagar |
2015 | Execution of Detailed Geotechnical Investigation Work Including Laboratory Testing for 2×800 MW (Phase #II) Kawal Thermal Power Project, Kawal, Baran, Rajasthan | Adani power Rajasthan Ltd. |
2014 | Geotechnical Investigation for Hazira Railway Line (Ch.30.80 km to Hazira Port Entry Point Ch.44.60 km) at Hazira | hazira infrastructure pvt. ltd., surat |
2013 | Consultancy Services for Carrying out sub soil Investigation with marine bore holes at Gogha and Dahej for the Ro-Ro Pherry Service Project. | Gujarat Maritime Board, |
2016 | Soil Investigation work for Proposed Project “Providing boat berthing facilities for pilgrims of Narmada Parikrama at Luhara (Dahej) | Gujarat Maritime Board |
2014 | Geotechnical Investigation for River Crossing in Gujarat for DahejNagothane Ethane Pipeline Project | Reliance Gas Pipeline Ltd. |
2005 | Geotechnical Investigation for the study of the stability of walls, bastions and slopes of Jaisalmer fort, Jaisalmer | Archaeological Survey of India |
2014 | Work for Inclinometer/ Permeability testing phase-II at Jaisalmer Fort Project-III | Archaeological Survey of India |
2016 | Offshore (Marine) drilling work in water depth of 5 Mtrs to 10 Mtrs for foundation Geological investigation to be carried out through Rotary/Hydraulic drilliung rig for Drilling of 3 Bore holes of 40 Mtrs. Each depth at bridge on Bhadar river near Porbandar as per IS:1892:1979 with conducting SPT test collection of UDS samples and providing core boxes for Rocky strata as required including mobilization | Road & Building Division, |
2012 | Topographical and Geo-Technical & Hydrological Survey for HDD in Narmada River Near Bharuch | Gail India Limited |
2014 | Geotechnical Investigation for River Crossing in Gujarat for DahejNagothane Ethane Pipeline Project | Reliance Industries Ltd. |
2017 | Consultancy Services for Offshore & Onshore Geotechnical Investigation for Fisheries Harbors at Veraval, Porbandar&Okha | Egis India Consulting Engineering Pvt. Ltd. |
2016 | Consultancy Services for Geotechnical Investigation and Topographical Survey for Ahmedabad-Mumbai Bullet Train | FUGRO GEOTECH (INDIA) LTD. |
2014 | Conducting Digital survey for Existing All India Radio &Doordarshan Installations at Mumbai, Maharastra, Madhya Pradesh, Chattisgarh, Gujarat& Goa. | PRASAR BHARTI (Civil Construction Wing) |
2017 | Topographical Survey & Soil Investigation Works for Construction of New Domestic Terminal Building and associated works at LEH Airport (J & K) | Engineers India Limited, |
2017 | Topographical Survey and Soil Investigation works for AMRUT Odisha | Engineers India Limited |
2013 | Grid Survey, Pipeline Survey & Geotechnical Investigation for BilaspurTonkUniyaraDeoli water supply project for 436v Villages in the state of Rajasthan | H. G. Infra Engineering Pvt. Ltd. |
2003 | Work for site Exploration, Performing geotechnical & hydrological Investigation, Preparation of drawing of existing bridge for Rebuilding of cast Iron screw pile bridge no. 18, 23, 35, 42, 48 in Bharuch-Jambusar (NG) section of Western Railway | Western railway |
2014 | Strengthening, Repairs of abutments and slabs by Grouting and guniting of various distressed bridges with Pre and post NDT test | SomDatt Builders-NCC |
2015 | Work for Strengthening/Widening of Pavement of SH- No.7 (Deesa-Jerda-Pathawada-Gund ri Section ) between km 0 to 43 | FrischmannPrabhu (India) Pvt. Ltd. |
2013 | Consultancy services for Structural Stability Assessment of factory Building at Ingersoll Rand, Sahibabad, Ghaziababd,UP | C. R. Narayana Rao |
2015 | Consultancy services for Structural Stability Investigation at Bawal, Rewari, Haryana | C. R. Narayana Rao |
2008 | Consultancy services for developing Infrastructure Facility(Designing of storm water drain, Finalisation of FRL & Working out Cutting-Filling quantity) | Arvind Infrastructure Ltd. |
2007 | Third Party Inspection for Upgradation of Industrial Infrastructure of GIDC Estate, Phase-I, Mehsana | Mehsana Industries Owners Association |
2007 | Geotechnical Investigation & Pavement Design for Proposed Construction of Road of “Muldwarka- Corridor (Phase I) | Ambuja Cement Amgujanagar, Kodinar, Junagadh, Gujarat |
2014 | Consultancy Services for design of drainage network with DTP Including Topography/Contour survey for 245 acres and Preparation & Submission of plan/cross section at SDCCL Plant Jamnagar, Gujarat. | Shree Digvijay Cement Co. Ltd |
2015 | Non- Destructive testing for the railway over bridge at Karjan which Includes Rebound Hammer Test, Ultrasonic Pulse velocity test, Extracting Concrete core by Hilty German make portable core drilling machine and preparing detailed technical report | Office of Executive Engineer, |
2016 | Carryout the Pump-out test work in the chir river bed for “Part-A Setting up the machinery, drilling of boreholes and installation of PVC pipeline with pea gravel all around†for water withdrawal system to meet the annual water requirement of Godda thermal Power project at Village: Motia, Godda, Ranchi | Wapcos Limited, |
2017 | Lab Testing for Construction Material for the Construction of Corporate Bhawan at TP scheme no. 38 at Thaltej, Ahmedabad | NBCC India Limited. |
2050 | 2050 | 2050 |